Sign In | Join Free | My infospaceinc.com
China Shanghai Sunshine Industry Technology Co., Ltd. logo
Shanghai Sunshine Industry Technology Co., Ltd.
To be sincere and keep moving !
Active Member

4 Years

Home > Large Part Machining >

Carbon Steel Wind Turbine Tower Transition Piece

Shanghai Sunshine Industry Technology Co., Ltd.
Contact Now

Carbon Steel Wind Turbine Tower Transition Piece

Brand Name : SSI-hdcz

Model Number : SSI-1

Certification : mill certificate

Place of Origin : China

MOQ : 1

Price : pending

Payment Terms : L/C, D/A, D/P, T/T, Western Union

Delivery Time : 3 months

Packaging Details : nude

material : carbon steel

paint : PPG

process : rolled

color : white

application : offshore and on shore

product : wind turbine tower

welding test : NDT

fabricate : welding

Contact Now

Wind Turbine Tower Transition Piece

For surface treatment of local corrosion parts, the oxidized corrosion layer and old coating of the corrosion parts shall be completely removed by spraying, and the exposed metal base metal shall reach grade s2.5. The edges of the treated parts shall be polished with power grinding wheel to form a gradient transition layer so as to have a smooth and smooth surface after paint construction. (compared with the traditional manual grinding, the spraying method can completely and thoroughly remove the rust and old coating in the deep layer of the oxidized or even pitted steel plate, and can form good anchor chain type rough lines, which is conducive to forming good bonding force with the primer.)

After spraying, the primer shall be manually brushed (roller coated) according to the original supporting scheme to reach the specified film thickness. (hand brushing and roller coating can control the position of primer during construction, do not pollute the original coating on the edge, and also effectively control the consumption of primer)

Brushing or spraying can be used for the construction of intermediate paint to reach the original supporting construction film thickness. The edge area shall be protected and shielded by spraying. The shape of the shield shall be "mouth" shape to form a regular appearance effect (the edge protection of intermediate paint construction can effectively control consumption and ensure the appearance effect)

Topcoat Construction: if the local repair scheme is adopted, the topcoat can be directly sprayed or brushed to meet the original design thickness requirements after the intermediate paint construction meets the thickness standard and meets the requirements of point 3. If the scheme of full construction finish is adopted, the outer surface of the whole tower shall be thoroughly cleaned after the intermediate paint construction reaches the thickness standard. Cleaning method: use 80-100 mesh abrasive cloth to scrub the coated surface, remove the powdered layer, dirt and dirt on the surface of the old coating, and use chemical cleaning to remove the oil stain on the part with oil stain, so that the coated surface can be completely cleaned and then the finish coat can be sprayed.

Feature

product wind turbine tower
painting PPG
color yellow
material carbon steel
application offshore
welding test NDT
steel working welding and inspected
process rolled
Manufacturing process
1, material cutting
Carbon Steel Wind Turbine Tower Transition Piece
2. steel plate rolling and welding
Carbon Steel Wind Turbine Tower Transition Piece
3. welding
Carbon Steel Wind Turbine Tower Transition Piece
Carbon Steel Wind Turbine Tower Transition Piece
4. NDT test
Carbon Steel Wind Turbine Tower Transition Piece
5. paint inspection
Carbon Steel Wind Turbine Tower Transition Piece
6. testing and inspection instrument
Carbon Steel Wind Turbine Tower Transition Piece
7. wind turbine tower transfer and shipment
Carbon Steel Wind Turbine Tower Transition Piece
Carbon Steel Wind Turbine Tower Transition Piece


Product Tags:

wind power transition piece

      

wind power tower

      

Wind Turbine Tower Transition Piece

      
Quality Carbon Steel Wind Turbine Tower Transition Piece for sale

Carbon Steel Wind Turbine Tower Transition Piece Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Shanghai Sunshine Industry Technology Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)